Scanning & verification

Post Tension Inspection and Testing Services UAE Scanning, Verification and Load Testing

A post-tensioned slab hides everything that matters. The tendons, their profile, the grout around them and the forces they carry are all sealed inside concrete the moment the pour is finished. Inspection and testing is how anyone finds out what is actually in there, whether that is a consultant releasing a pour, an owner investigating a crack, or a contractor about to core a hole through a slab they did not build.

We provide post tension inspection and testing services across the UAE: material testing, anchor inspection, load testing, post tension scanning to locate tendons in existing slabs, and support for third-party verification. Our base is Ajman and our DED Ajman licence covers every emirate. Each emirate has its own page on this site for local context: Dubai, Sharjah, Abu Dhabi, Ras Al Khaimah, Fujairah and Umm Al Quwain.

Licensed by DED Ajman, License No. 127328. PTI certified.

01

Scanning to locate tendons before anyone drills, cores or cuts into a post-tensioned slab

02

Inspection records produced as the work happens, formatted for consultant review

03

Testing carried out by people who install and stress post-tensioning, so findings come with context

04

Licensed by DED Ajman and PTI certified, working to Post-Tensioning Institute practice

Ajman track record

Where Does Our Inspection and Testing Experience Come From?

Our inspection and testing experience comes from carrying it out as part of our own project scope on four buildings in Ajman, where cube testing, anchor inspection and quality control were contractual obligations we delivered and documented rather than services we bought in.

In Al Yasmeen, in the Eastern Sector, two adjacent G+M+4+R residential buildings. In Al Jurf, in the Northern Sector, a G+4+R residential building and an 11-level structure built as G+2P+8T+R with two parking floors. On the 11-level structure in particular, the inspection and testing record had to stay coherent across eleven floors and two different slab types, because a consultant reviewing floor nine will compare it against floor two.

Recent project highlights

Which Inspection and Testing Work Have We Recently Delivered?

Real inspection and testing programmes, shown as reference points rather than a catalogue.

Anchor inspection at a post-tensioned slab edge before stressing
Four buildings. Inspected and tested floor by floor, records compiled as the work happened.

Two residential buildings, Al Yasmeen

Roughly 4,200 and 4,300 square metres of post-tensioned slab, both G+M+4+R, with pre-pour inspection, cube testing and stressing verification carried out floor by floor.

An 11-level structure with parking, Al Jurf

About 9,340 square metres, G+2P+8T+R. Eleven levels of repeated inspection cycles, with the added complication that the parking floors and residential floors had different tendon layouts, so the inspection checklist was not identical from floor to floor.

A G+4+R residential building, Al Jurf

Roughly 3,570 square metres, with a more uniform inspection sequence.

220mm to 280mm slab thicknesses

Across these buildings slabs ran 220mm to 280mm thick with steel ratios between 55 and 80 kg per cubic metre, so the acceptance criteria differed building to building. Inspection against a generic checklist would have missed that.

Technical expertise

What Can Post-Tension Inspection and Testing Actually Detect?

Eight checks, and each one answers a question a generic inspection would miss.

Pre-pour inspection of tendon profile heights and chair spacing
Checked before the pour. Profile, chairs and anchors verified while correcting an error is still cheap.

Post tension scanning, and why it matters before you drill

Scanning locates tendons inside an existing slab non-destructively. Drilling or coring into a post-tensioned slab without knowing where the tendons run can sever one under full load, which is a safety event, not a repair item. Anyone planning a penetration should scan first.

Pre-pour inspection

Before concrete is placed, tendon profile heights, chair spacing, anchor alignment, duct continuity and strand condition are verified against the drawings. This is the only moment when correcting an error is cheap.

Material testing

Verification of the strand, anchors and components against their certification, so what arrived is what was specified.

Cube testing and strength verification

Concrete strength governs when stressing may begin, so cube results are not a formality. They are the gate that determines whether a stressing operation is safe to carry out at all.

Stressing verification

Measured elongation against calculated elongation, tendon by tendon. This is the primary evidence that the design force actually reached the steel.

Anchor inspection

Anchorage zones carry the most concentrated force in the structure, and they are inspected before stressing and checked after lock-off.

Load testing

Where a structure's actual capacity needs demonstrating rather than calculating, typically on existing buildings, a change of use, or where records are missing.

Support for third-party verification

Where a consultant or authority requires independent verification, we prepare and present the documentation that process needs.

Inspection programme

How Do We Run an Inspection and Testing Programme?

Eight steps for new construction, confirmed against drawings and hold points, not a generic checklist.

Step 01

Establish what is being verified and against what

The drawings, the specification and the acceptance criteria for this specific structure, not a generic standard.

Step 02

Agree hold points with the consultant

Which stages require inspection before work proceeds, agreed in advance rather than discovered mid-pour.

Step 03

Pre-pour inspection

Profile, chairs, anchors, ducts and strand condition checked and recorded, with photographs where useful.

Step 04

Material verification

Certification checked against delivered components.

Step 05

Strength testing

Cube results tracked against the strength required for stressing.

Step 06

Stressing verification

Elongation measured and recorded against calculated values, deviations investigated rather than noted.

Step 07

Post-grouting checks

Anchorage sealing and grouting records reviewed and compiled.

Step 08

Compile and issue the report

A single documented record the consultant can sign against, rather than a folder of loose sheets assembled later.

Concrete cube samples prepared for strength testing

Tested against acceptance criteria, not assumed from the mix design.

8-step programme40+ projects verified1 accountable team

Credentials

Is Premium Post Tension Qualified for PT Inspection and Testing Work?

Licence and certification documentation is available on request with any quotation.

DED Ajman trade licence No. 127328

Registered for concrete works and pre-tension construction units building and execution works.

PTI certified

We work to Post-Tensioning Institute practice, the reference standard covering post-tensioning materials, installation, stressing and grouting.

Established 2024

40+ completed projects and a team of over 50.

Why clients choose us

Why Do Consultants Ask Us to Verify Post-Tensioned Slabs?

Because a finding is only useful if it comes with an explanation. An inspector who has never installed a tendon can report that an elongation reading is 8 per cent short. Someone who has spent years threading strand through ducts can tell you what usually causes an 8 per cent shortfall at that location and what to check next. The measurement is the same. The value is not.

The second reason is documentation discipline. Consultants are not really buying an inspection, they are buying a defensible record. Ours are produced during the work, tied to specific tendons, floors and dates, and compiled into something that can be signed against rather than a set of notes reconstructed afterwards.

The third is scanning, which is increasingly the reason people call. Any alteration to an existing post-tensioned building starts with the question of where the tendons are, and getting that answer wrong has consequences no amount of care later can undo.

Common questions

FAQs About Post-Tension Inspection, Scanning and Testing

All of the UAE. Our DED Ajman licence covers every emirate, and Ajman is our home base where most of our completed work sits. Each emirate has its own page on this site.

Start your project

Need a Post-Tensioned Slab Inspected, Scanned or Tested?

Tell us whether this is a live project needing inspection through construction, or an existing structure you need to understand before altering it. The approach differs considerably, and so does what we would recommend.

  • Phone+971 56 530 0632
  • Emailinfo@premiumpt.ae
  • Premium Post Tension Concrete WorksBuilding 2, Plot 0687, Shop 3, Al Alia, Ajman, United Arab Emirates
  • HoursSaturday to Thursday: 7:00 AM to 10:00 PM
    Friday: Closed