Post Tension Installation Services UAE Licensed Tendon Installation for Contractors and Consultants

Installation is where a post-tensioned slab stops being a drawing and becomes a structure. Every assumption the designer made about tendon height, spacing and anchor position now has to survive a live site, a rebar crew working to its own sequence, and a pour date that is not going to move.

We provide post tension installation services across the UAE, covering tendon layout and fixing, anchor installation, strand threading, and the coordination with reinforcement works that determines whether the pour goes smoothly or turns into a half-day argument. Our base is Ajman, where most of our completed work sits, and our DED Ajman licence covers projects in every emirate. If you want to see how post-tensioning is being used in your specific market, each emirate has its own page: Dubai, Sharjah, Abu Dhabi, Ras Al Khaimah, Fujairah and Umm Al Quwain.

Licensed by DED Ajman, License No. 127328. PTI certified.

01

Installation crews who work to our own design, so tendon questions get answered on site rather than escalated

02

Tendon layout coordinated with the reinforcement works before the pour, not negotiated during it

03

40+ completed projects, from single residential buildings to an 11-level structure with two parking floors

04

Licensed by DED Ajman and PTI certified, with installation records prepared for consultant handover

Ajman track record

Where Does Premium Post Tension's Installation Experience Come From?

Most of our completed installation work sits in two areas of Ajman, and the concentration is useful rather than limiting. Repeat work in the same districts means our crews have installed into the same soil conditions, the same consultant expectations and the same municipality sign-off process enough times that very little about them is a surprise.

In Al Yasmeen, in the Eastern Sector, we installed post-tensioning on two adjacent residential plots, each a G+M+4+R building. In Al Jurf, in the Northern Sector, we installed on a G+4+R residential building and separately on an 11-level structure built as G+2P+8T+R, including two parking floors. Different building types, different tendon layouts, same crews.

Recent project highlights

Which Post-Tension Installation Projects Have We Recently Completed?

Real installation projects, shown as reference points rather than a catalogue.

Post-tensioned slab under installation on a multi-storey building in Ajman
Four buildings. Four tendon layouts, installed by the same crews.

Two residential buildings, Al Yasmeen

Roughly 4,200 and 4,300 square metres of post-tensioned slab respectively, both G+M+4+R. The second building followed the first closely enough that the installation sequence carried straight across, which is the practical benefit of the same team handling consecutive plots.

An 11-level structure with parking, Al Jurf

About 9,340 square metres, built as G+2P+8T+R. The two parking floors changed the installation picture considerably. Parking levels carry different loads and want a different column grid than the residential floors above them, so the tendon layout changes between levels rather than repeating floor to floor. Installation crews have to be reading the right drawing for the right slab, every time.

A G+4+R residential building, Al Jurf

Roughly 3,570 square metres, a more conventional layout, and a useful counterpoint to the tower on the same district.

220mm to 280mm slabs, 55 to 80 kg/m³

Across all four buildings the installed slabs ran between 220mm and 280mm thick, with steel ratios between 55 and 80 kg per cubic metre. That spread is normal. It reflects genuinely different spans and loads, not inconsistency.

Technical expertise

What Does Correct Post-Tension Installation Actually Require?

Four disciplines, each with its own failure mode if it is wrong.

Post-tension anchor fixed at a slab edge with bursting reinforcement
Matched to the drawing. Installed as specified, not adapted on site.

Tendon profile accuracy

A post-tensioning tendon is not a straight bar. It follows a designed curve through the slab depth, high over the supports and low at mid-span, because that profile is what allows the tendon to lift load off the slab once stressed. If the tendon sits at the wrong height, the slab does not behave the way the design predicted. Chair heights and fixing intervals are therefore not site-discretion items, and we install them as specified.

Anchor installation and edge detail

Anchors transfer the entire tendon force into the concrete at the slab edge, which makes the anchorage zone one of the most heavily stressed regions in the whole structure. Anchors need correct alignment, correct bursting reinforcement behind them, and formwork that will not shift them during the pour.

Strand threading and duct integrity

Strands are threaded through ducts that must stay continuous and undamaged. A duct crushed by foot traffic or punctured by a vibrator becomes a grouting problem later, and a grouting problem eventually becomes a corrosion problem.

Coordination with reinforcement

Tendons and rebar occupy the same slab depth and compete for the same space. When the two trades sequence their work together, the pour proceeds. When they do not, someone is cutting or relocating steel on the day of the pour, with the concrete already ordered.

Installation process

Our Installation Process: What Does a PT Install Look Like on Site?

Eight steps, each one closed out before the deck is ready for concrete.

Step 01

Drawing review and site walk

Before any material arrives, we check the approved shop drawings against the actual slab, formwork and reinforcement arrangement. Discrepancies found here cost minutes. The same discrepancies found on pour day cost a day.

Step 02

Material check on delivery

Strands, anchors, wedges, ducts, chairs and couplers are checked against the schedule for the specific slab, not the project in general.

Step 03

Setting out and duct placement

Tendon positions are marked out on the deck, ducts laid to the designed profile, and chairs set at the specified intervals to hold that profile under load.

Step 04

Anchor installation

Anchors are fixed at the slab edges with their bursting reinforcement, aligned to the tendon direction and secured against movement during pouring.

Step 05

Strand threading

Strands are threaded through the ducts and left at the correct extension beyond the anchor for the stressing jack to grip.

Step 06

Coordination and joint inspection with reinforcement

The rebar and PT layouts are walked together before closing the deck, so conflicts are resolved before concrete is on order.

Step 07

Pre-pour inspection and sign-off

Profile heights, anchor positions, duct continuity and strand condition are all checked and recorded, then presented for consultant inspection.

Step 08

Protection during the pour

Someone from our crew stays on the deck during pouring, because a displaced chair or a damaged duct at that moment is recoverable and, once the concrete sets, is not.

Installer threading strand through a post-tension duct

Read on site, checked before the pour.

8-step process40+ projects installed1 accountable team

Credentials

Is Premium Post Tension Licensed and Certified for PT Installation Work?

Installation records are prepared for consultant handover, and licence documentation is available with any quotation.

DED Ajman trade licence No. 127328

Registered for concrete works and pre-tension construction units building and execution works.

PTI certified

We work to Post-Tensioning Institute practice, which is the reference standard the industry uses for post-tensioning materials, installation and grouting.

Established 2024

40+ completed projects and a team of over 50.

Why clients choose us

Why Do Consultants and Contractors Choose Premium Post Tension for Installation?

The most common reason is the one that sounds least dramatic: we designed most of what we install. When a question arises on the deck about a tendon position or a clash with reinforcement, it does not have to travel back through a separate design office and return two days later. The people who set the profile are reachable, and often already on site.

The second reason is documentation. Consultants release the next pour on evidence. Our pre-pour inspection records, profile checks and material verification are produced as the work happens and prepared for handover, not assembled afterwards when someone asks for them.

The third is scale flexibility. We have installed on single residential buildings and on an 11-level structure with two parking floors, with a team of over 50 and more than 40 completed projects since 2024. A small villa slab and a tower podium need different crew sizes and different sequencing, and we would rather size the crew to the job than send the same team to both.

Common questions

FAQs for Contractors Planning a Post-Tension Installation in the UAE

All of the UAE. Our DED Ajman licence covers work in every emirate, and Ajman is our home base, where most of our completed installations are. If you want detail on how post-tensioning is being used in a specific emirate, each has its own page on this site.

Start your project

Ready to Schedule Your Post-Tension Installation?

Send us the slab drawings, or just tell us the building type, the floor area and when you expect to pour. We will tell you what the installation scope actually involves for that structure and where the coordination risks sit.

  • Phone+971 56 530 0632
  • Emailinfo@premiumpt.ae
  • Premium Post Tension Concrete WorksBuilding 2, Plot 0687, Shop 3, Al Alia, Ajman, United Arab Emirates
  • HoursSaturday to Thursday: 7:00 AM to 10:00 PM
    Friday: Closed

Request an installation quote

Tell us about your project

Ajman headquartersGet directions ↗